Pre-Design

Program

Budget

Measured Structures Survery

Measured Site Survey

 

Schematic Design

SD drawings

SD Specifications

SD Estimate

SD Allowances

SD Approval letter

DESIGN Development

DD drawings

DD Specifications

DD Estimate

DD Allowances

DD Approval letter

Contract Documents

CD drawings

CD Specifications

CD Estimate

CD Allowances

CD Approval letter

AIA - Owner / GC / Arch

Add Service - Owner / Arc

 

Permit APPROVAL

Architectural Permit

Civil Permit

Structural Permit

Change Ord.

CO 004 Approval

CO 004

CO 003Approval

CO 003

CO 002 Approval

CO 002

CO 001 Approval

CO 001

Construction Docs

RFI 005 Detail

RFI 004 Detail

RFI 003 Arch

RFI 002 - Foundation

RFI 001 - Structural

 

Const. Approvals

Measured Site Survey Approval

Foundation Layout Approval

Foundation Pattern Approval

Window & Door Approval

Roofing Approval

Siding Approval

Cabinet Approval

Countertop Approval

Plumbing Fix. Approval

Electrical Layout Approval

Electrical Fix. Approval

Appliance Approval

Flooring Approval

Paint Approvals

Punch List Approval

Warrantee Paperwork

2 Month Approval